TURCHI 300F battipalo fotovoltaico in cantiere

    Photovoltaic Pile Driver TURCHI 300F

    Solar Pile Driver: 150+ piles a day, one operator

    The TURCHI 300F solar pile driver installs 150+ piles per day with a single operator. Already chosen by 1,500+ clients in 55+ countries.

    12-hour response · No obligation · Made in Italy

    Order today → delivery by October 2026 · Order confirmation within a week

    Benefits

    Why choose the TURCHI 300F for solar

    Pile driving speed, site autonomy and Made in Italy quality: three concrete reasons installers and EPCs choose the 300F on utility-scale projects.

    • Solar installers
    • EPC
    • Construction
    • Utility scale
    Photovoltaic site in Voghera, Italy — aerial view after pile driving

    150+piles per day

    Up to 150+ piles per day

    The TURCHI 300F solar pile driver, with its advanced hydraulic system, delivers maximum pile driving speed for ground-mounted solar installations without compromising quality.

    Driving H-piles on a solar job site

    0crane & trailer on site

    Zero downtime

    Moves from point to point without crane or trailer. The TURCHI 300F is ready to work in minutes, saving hours of logistics every day. More piles, less waiting.

    Made in Italy reliability

    1973Manufactured in Italy · Pilastro (PR)

    Made in Italy reliability

    Since 1973, TURCHI has built pile drivers built to last. Premium components, 24/7 global service. The value of equipment engineered to work for generations.

    TURCHI 300F in action on a solar farm construction site360° view

    The machine

    Engineered to never stop

    The TURCHI 300F is our flagship model for photovoltaic projects. Every detail is designed for maximum field productivity: from the hydraulic system to the load-bearing structure, everything speaks efficiency.

    The TURCHI 300F solar pile driver is the most chosen solution by professional solar installers for ground-mounted plants from 1 MW upwards. Compatible with any pile profile, it reaches 6 metres depth and is transported on a standard 5-tonne trailer. A photovoltaic pile driving machine that pays for itself from the first job.

    PRODUCTS

    The right product for this topic

    Explore TURCHI solutions for your jobsite.

    TURCHI 300F hydraulic pile driver on solar farm3+ MW · Utility

    TURCHI 300F

    150+piles per day

    Best for

    3+ MW arrays, maximum productivity, large projects

    Machine type
    Self-propelled tracked
    Working heights
    4.40 m / 5.20 m / 6.00 m (with extensions)
    Weight
    4.400 kg
    Impact energy
    950 / 1.200 J
    System pressure
    180 bar
    Frontal tilt
    +10° / -51°
    Lateral tilt
    ±9,5°
    Setup time
    15 minutes
    Operators
    1
    Power
    34.4 kW (46 HP) @ 3,000 rpm — 41 kW (56 HP) @ 2,500 rpm
    Emissions
    Euro 5 / Tier 5
    Frequency
    620–1,500 bpm (950J) — 570–1,180 bpm (1,200J) — 520–1,050 bpm (1,500J)
    Track speed
    1.92 – 3.33 km/h
    Dimensions (folded) · Length
    2,100 mm
    Dimensions (folded) · Width
    2,350 mm
    Dimensions (folded) · Height
    2,670 mm (mast raised)

    Configuration

    Accessories that make the difference

    The TURCHI 300F can be configured with optional accessories that maximise productivity, precision and return on investment.

    01Pre-drilling + Screw piles

    Rotation head

    Available in lateral (1 motor) or central (2 motors) configuration. Mounts augers and DTH hammers for pre-drilling in hard soils, or drives screw piles directly with the same machine. One machine, two functions.

    02Up to +30% faster

    STONEX semi-automatic GPS

    Integrated GNSS system with centimetre accuracy that automatically guides the pile driver to the exact project coordinates. Zero piles off-position, reduced errors and up to 30% faster positioning.

    03Precision on any terrain

    Automatic verticality

    Digital inclinometer and automatic hydraulic correction system that keeps the column perfectly vertical even on sloped ground. Every pile is plumb without manual adjustment.

    04Pre-drilling

    Hydraulic core drill

    Pre-drilling attachment for hard and rocky soils. Reduces stress on the pile and speeds up driving. Available in two field configurations.

    • 4-hole
    • Single

    05Operator safety

    Radio remote control

    Wireless machine operation. The operator controls movements from a safe distance while keeping direct sight of the driving point. Available in two configurations.

    • Full
    • Tracks only

    062 motors

    Head rotation · central (2 motors)

    Driving head with central-axis rotation powered by two opposed hydraulic motors. More torque and symmetric positioning relative to the column — suited to larger section piles and sites demanding high angular precision.

    07Rocky soils

    DTH · down-the-hole hammer

    Pre-drilling in rocky or hard soils using a down-the-hole hammer mounted in line with the column. Overcomes compact layers while keeping the pile vertical, without repositioning the machine.

    08End-of-life sites

    Mechanical extractor

    Fast pile extraction for repositioning or dismantling the plant. Mechanical pile coupling, controlled lift in line with the column. Ideal at PV site end-of-life for full structure recovery — without third-party equipment.

    0924/7 site work

    Lighting kit

    High-brightness LED work light on the column, aimed at the driving zone. Work in low light — dawn, dusk, tunnels, covered sites — without external light towers. Powered directly from the machine electrical system.

    Case study

    ~1,850 piles in 12 working days. Two operators. Zero machine stops.

    How two operators completed ~1,850 piles in 12 days using a TURCHI 300F

    From the site

    “With the TURCHI 300F we handed over the site three days ahead of schedule. The client awarded us the second lot directly.”

    Original (Romanian)

    “Cu TURCHI 300F am predat șantierul cu 3 zile mai devreme față de graficul de execuție. Clientul ne-a încredințat direct al doilea lot.”

    Site manager — EPC contractor, Romania

    Reviews

    What our customers say

    Voghera site, Italy — machine handover among the driven pile rows
    Voghera site, Italy — machine handover among the driven pile rows

    “With the Turchi 300F we drove 4,000 piles in 23 days, with a single operator.”

    Giovanni Corrado — 6 MW photovoltaic plant · Voghera (Pavia) · Italy

    “We replaced two traditional pile drivers with a single TURCHI 300F on a 2 MW plant in Veneto. Now we do twice the piles with half the staff. ROI came in under 8 months.”

    Marco R. — Operations Director · EPC Solare · Veneto, Italy

    “The speed of the TURCHI 300F helped us win more tenders. On our last 3 MW project we completed in 12 days what used to take a month.”

    Stefan D. — CEO · GreenField Energy · Timișoara, Romania

    “Impeccable service. A spare part arrived in 36 hours from request, right on our job site in Bavaria. With other suppliers we waited weeks.”

    Andreas K. — Technical Manager · SolarBau GmbH · Bavaria, Germany

    From the field

    Media from clients

    Photos and videos shot by our customers on real sites — installers and EPCs with the 300F at work, not studio edits.

    Visit our factory · Italy

    See it in person

    The TURCHI 300F is not something you only read about — you see it work. We invite you to our plant in Pilastro di Langhirano, near Parma, to experience the machine, watch it operate, and speak directly with the engineers who design and build it.

    TURCHI plant
    Via Ugo la Malfa, 51 · 43013 Pilastro di Langhirano (PR) · Italy
    By appointment, Monday to Friday20 minutes from A1 motorway (Parma Ovest exit)

    FAQ

    FAQ

    The TURCHI 300F installs up to 150+ piles per day with a single operator. For a 1 MW solar plant (approx. 350–450 piles), completion takes about 2–3 working days. For 3 MW, about 7–10 days. This makes it ideal for meeting tight project timelines.

    Every TURCHI machine comes with full CE certification, manufacturer warranty, and access to our 24/7 global support network. Original spare parts are delivered within 48 hours anywhere in Europe. We also provide operator training and on-site technical assistance.

    THE COST OF WAITING

    Every month without the 300F on site:

    • ~3.000

      piles not installed

      150+ piles/day × 20 working days

    • ~7 MW

      equivalent plant capacity

      350–450 piles per MW

    • tenders won by those who deliver first

    Our customers report ROI in under 8 months. The biggest cost isn't the machine — it's every month spent without one.

    Get a free quote in 12 hours

    Fill it in 30 seconds. We'll get back to you.

    Reply within 12 hoursNo commitment

    Production: 30 machines/month, made to order. Next deliveries: October 2026 — limited September 2026 slots almost gone

    Price locked for 30 days from request — valid even if the list price is updated.
    1,500+ clients55+ countriesMade in Italy

    Prefer to contact us directly?

    The TURCHI 300F is the Made in Italy self-propelled solar pile driver designed for professional solar job sites. Pile driving machine for ground-mounted photovoltaic installations, available with semi-automatic GPS, automatic verticality and pre-drilling kit. Request a free quote — response within 12 hours.

    Delivery across Europe

    Specialized transport with on-site delivery

    After-sales support

    Technical support and spare parts in 48h

    CE certified machines

    Every machine is tested before delivery

    Secure and flexible payments

    Bank transfer or financing

    Turchi Daniele SRL · Via Ugo la Malfa, 51 · 43013 Pilastro di Langhirano (PR) · P.IVA 01515010344

    Privacy Policy | Cookie Policy

    © 2026 Turchi Daniele SRL — All rights reserved.

    logo

    We (www.turchi.pr.it) and selected third parties (3) collect personal information as specified in the privacy policy and use cookies or similar technologies for technical purposes and, with your consent, for measurement and “marketing (personalised ads)” as specified in the cookie policy.

    You can freely give, deny, or withdraw your consent at any time by accessing the preferences panel. Denying consent may make related features unavailable.

    Use the “Accept” button to consent.