
150+piles per day
Up to 150+ piles per day
The TURCHI 300F solar pile driver, with its advanced hydraulic system, delivers maximum pile driving speed for ground-mounted solar installations without compromising quality.

Photovoltaic Pile Driver TURCHI 300F
The TURCHI 300F solar pile driver installs 150+ piles per day with a single operator. Already chosen by 1,500+ clients in 55+ countries.
12-hour response · No obligation · Made in Italy
Order today → delivery by October 2026 · Order confirmation within a week
Benefits
Pile driving speed, site autonomy and Made in Italy quality: three concrete reasons installers and EPCs choose the 300F on utility-scale projects.

150+piles per day
The TURCHI 300F solar pile driver, with its advanced hydraulic system, delivers maximum pile driving speed for ground-mounted solar installations without compromising quality.

0crane & trailer on site
Moves from point to point without crane or trailer. The TURCHI 300F is ready to work in minutes, saving hours of logistics every day. More piles, less waiting.

1973Manufactured in Italy · Pilastro (PR)
Since 1973, TURCHI has built pile drivers built to last. Premium components, 24/7 global service. The value of equipment engineered to work for generations.
360° viewThe machine
The TURCHI 300F is our flagship model for photovoltaic projects. Every detail is designed for maximum field productivity: from the hydraulic system to the load-bearing structure, everything speaks efficiency.
The TURCHI 300F solar pile driver is the most chosen solution by professional solar installers for ground-mounted plants from 1 MW upwards. Compatible with any pile profile, it reaches 6 metres depth and is transported on a standard 5-tonne trailer. A photovoltaic pile driving machine that pays for itself from the first job.
PRODUCTS
Explore TURCHI solutions for your jobsite.

Best for
3+ MW arrays, maximum productivity, large projects
Configuration
The TURCHI 300F can be configured with optional accessories that maximise productivity, precision and return on investment.
01Pre-drilling + Screw piles
Available in lateral (1 motor) or central (2 motors) configuration. Mounts augers and DTH hammers for pre-drilling in hard soils, or drives screw piles directly with the same machine. One machine, two functions.
02Up to +30% faster
Integrated GNSS system with centimetre accuracy that automatically guides the pile driver to the exact project coordinates. Zero piles off-position, reduced errors and up to 30% faster positioning.
03Precision on any terrain
Digital inclinometer and automatic hydraulic correction system that keeps the column perfectly vertical even on sloped ground. Every pile is plumb without manual adjustment.
04Pre-drilling
Pre-drilling attachment for hard and rocky soils. Reduces stress on the pile and speeds up driving. Available in two field configurations.
05Operator safety
Wireless machine operation. The operator controls movements from a safe distance while keeping direct sight of the driving point. Available in two configurations.
062 motors
Driving head with central-axis rotation powered by two opposed hydraulic motors. More torque and symmetric positioning relative to the column — suited to larger section piles and sites demanding high angular precision.
07Rocky soils
Pre-drilling in rocky or hard soils using a down-the-hole hammer mounted in line with the column. Overcomes compact layers while keeping the pile vertical, without repositioning the machine.
08End-of-life sites
Fast pile extraction for repositioning or dismantling the plant. Mechanical pile coupling, controlled lift in line with the column. Ideal at PV site end-of-life for full structure recovery — without third-party equipment.
0924/7 site work
High-brightness LED work light on the column, aimed at the driving zone. Work in low light — dawn, dusk, tunnels, covered sites — without external light towers. Powered directly from the machine electrical system.
Case study
How two operators completed ~1,850 piles in 12 days using a TURCHI 300F
From the site
“With the TURCHI 300F we handed over the site three days ahead of schedule. The client awarded us the second lot directly.”
Original (Romanian)
“Cu TURCHI 300F am predat șantierul cu 3 zile mai devreme față de graficul de execuție. Clientul ne-a încredințat direct al doilea lot.”
Reviews

“With the Turchi 300F we drove 4,000 piles in 23 days, with a single operator.”
“We replaced two traditional pile drivers with a single TURCHI 300F on a 2 MW plant in Veneto. Now we do twice the piles with half the staff. ROI came in under 8 months.”
“The speed of the TURCHI 300F helped us win more tenders. On our last 3 MW project we completed in 12 days what used to take a month.”
“Impeccable service. A spare part arrived in 36 hours from request, right on our job site in Bavaria. With other suppliers we waited weeks.”
From the field
Photos and videos shot by our customers on real sites — installers and EPCs with the 300F at work, not studio edits.
Visit our factory · Italy
The TURCHI 300F is not something you only read about — you see it work. We invite you to our plant in Pilastro di Langhirano, near Parma, to experience the machine, watch it operate, and speak directly with the engineers who design and build it.
FAQ
THE COST OF WAITING
~3.000
piles not installed
150+ piles/day × 20 working days
~7 MW
equivalent plant capacity
350–450 piles per MW
tenders won by those who deliver first
Our customers report ROI in under 8 months. The biggest cost isn't the machine — it's every month spent without one.
The TURCHI 300F is the Made in Italy self-propelled solar pile driver designed for professional solar job sites. Pile driving machine for ground-mounted photovoltaic installations, available with semi-automatic GPS, automatic verticality and pre-drilling kit. Request a free quote — response within 12 hours.
Delivery across Europe
Specialized transport with on-site delivery
After-sales support
Technical support and spare parts in 48h
CE certified machines
Every machine is tested before delivery
Secure and flexible payments
Bank transfer or financing