
Intersolar 2026: meet us in Munich
TURCHI will be exhibiting at Intersolar Europe 2026 in Munich, Hall A5 Booth 240. See the TURCHI 300F, tracked pile trolley and all utility-scale solar configurations live. Book a meeting with our team.
TURCHI · Help Center
Find answers on models, applications, support, transport and everything you need to choose and get the most from your TURCHI pile driver.
FAQ
Can't find what you're looking for? Contact us quickly through the or email us at commerciale@turchi.pr.it.
It depends on three factors: your sector, pile volume and transport constraints. For high-volume solar, the 300F is the bestseller — up to 150 piles/day. For guardrail or urban sites where compact size matters, the 160 — truck-mounted in CA (autonomous power unit) or PF (PTO-driven) version — is ideal. For vineyards and orchards, BACCO is built for agriculture. If unsure, use our comparison tool to decide in about two minutes.
Main differences are power and size. The 300F is the flagship — hydraulic hammer up to 1,200 J, ideal for high volumes and hard ground. The 260F offers similar versatility in a slightly more compact machine with hammer up to 950 J. The 160 is the truck-mounted model, with hammer up to 950 J, available as CA (autonomous power unit) or PF (PTO-driven from the truck gearbox). Compare them side by side for full specs.
FAQ
It depends on model, ground and pile length. In typical soft-to-medium soil with 2–3 m piles: 300F reaches 150+ piles/day, 260F about 150+, 160 about 100+ and BACCO about 150+. On harder ground output drops but remains far above manual methods.
Standard range is 3 to 6 metres depending on the column extension fitted. Extensions include 4.4 m, 5.0 m, 5.2 m and 6.0 m. For greater depth or very hard ground, TRI/4 core drilling and DTH hole drilling create pilot holes that ease driving.
FAQ
Yes — it is a core application. The 300F is the bestseller for solar: up to 150 piles/day, semi-automatic GPS positioning and automatic verticality for aligned panels. With the tracked trolley, one operator can complete a 1 MW plant in under two weeks.
Yes. TURCHI is a leading supplier for guardrail work in Europe. The 160 (truck-mounted) with swivel platform works both sides of the carriageway without moving the vehicle. The 260F and 300F are preferred for long motorway sections. All machines meet EN 1317 requirements.
FAQ
Yes. We provide full training on purchase. A technician works with your operator on site for 1–2 days covering startup, hydraulic adjustment, adapter changes, routine maintenance and safety. After that the machine is intuitive — most operators are independent from day two.
One operator for the pile driver — a major advantage versus traditional methods needing 2–4 people. Wireless remote control keeps the operator in a safe position. With the tracked trolley, a second person can feed piles in parallel to maximise flow.
FAQ
All TURCHI pile drivers have manufacturer warranty. Exact terms depend on model and configuration at purchase. Contact us for full warranty details on the model you need.
Genuine TURCHI parts ship within 48 hours across Europe from our Italian warehouse. For critical wear items we recommend keeping a small on-site spare kit — we can help you build the right kit for your model.
FAQ
Self-propelled models (300F, 260F, BACCO) travel on standard trailer or low-loader. The 160 is truck-mounted in both versions: CA (autonomous power unit) and PF (PTO-driven) — it drives to site on the work vehicle. Compact dimensions usually avoid special transport permits.
Setup about 15–20 minutes. The machine descends from the trailer via ramps, then positions autonomously on its tracks and starts production. No foundations, crane or special ground works — unlike fixed or excavator-mounted rigs.
FAQ
Price depends on model, configuration and accessories. We do not publish list prices because each machine is built to customer needs. Request a tailored quote and you will receive a detailed offer within 12 hours.
It depends on workload. On a solar site, cost per pile with a 300F is roughly €2–4 (fuel, depreciation, operator) versus €8–15 manually. At 20,000–50,000 piles/year, ROI is often reached in 12–18 months. Our team can model ROI for your case.
Our technical and sales team replies within 15 minutes to any question. No chatbots, no endless forms — you speak directly with people who know the machines.

TURCHI will be exhibiting at Intersolar Europe 2026 in Munich, Hall A5 Booth 240. See the TURCHI 300F, tracked pile trolley and all utility-scale solar configurations live. Book a meeting with our team.

Purchase or rental with operator? The right question isn't the daily cost — it's how many MW you install per year. Here's how to think about break-even in megawatts — without brochure numbers, because cost per MW depends on your ground and your piles.

Regular servicing like any machine (oils, filters, grease), plus a wear kit to keep in stock. Those working hard on tough ground spend about €7,000 a year on consumable parts. Here's what counts as routine maintenance and what's in the TURCHI 300F spare-parts kit.