TURCHI · Self-propelled hydraulic pile drivers
TURCHI 300F: Self-Propelled Pile Driver at 150+ Piles per Day
Built to keep working. TURCHI 300F — the tracked self-propelled hydraulic pile driver that pays back from the first job.

150+
Piles per day
Even on compact clay
6 m
Depth — covers 95% of EU sites
15 min
Setup — productive from day one
1
Operator — does the work of three
Built to keep working.
The TURCHI 300F is more than a machine. It is a business solution that changes how you work. Reliable diesel engine, proportional hydraulic mast and hammer certified up to 1,200 J — every detail maximises productivity.
One operator delivers the output of three. Setup takes 15 minutes. Depth reaches 6 m. Weight from 4,400 kg allows transport on a standard trailer.
Every day it works, it earns. Every day idle, it costs. The 300F was designed with that mindset: reliability, simple operation and ROI that speaks for itself.
The machine top European installers choose for solar sites.
One machine. Two sectors. Real results.

Complete a 1 MW plant in under 3 days
150+
piles/day
6 m
depth
The 300F is the go-to choice for ground-mount solar. Compatible with H, C, U and Sigma profiles. Depth up to 6 m covers 95% of European projects. At 150+ piles per day and ~350 piles per MWp, a 1 MW site finishes in under three working days.
Configure for solarHow it works. As simple as it looks.
Four intuitive steps from zero to productive.
Position
Move the machine to the first pile with simplified controls.
Align
Set tilt (±9.5° side, +10°/-51° front) in seconds.
Drive
Run the hammer and watch the pile reach full depth.
Move on
Go to the next pile and repeat.
No special training required. Intuitive from day one. The wireless remote gives full control from anywhere.
Full technical specifications
The numbers that matter, explained.
Type
Diesel 3–4 cylinder, liquid cooled
Robust workhorse found in thousands of professional machines.
Displacement
1,800 — 2,190 cm³
3 or 4 cylinders depending on option.
Power
34.4 kW (46 HP) @ 3,000 rpm
Tuned for high productivity with moderate fuel use.
Impact energy
950 J / 1,200 J (selectable)
950J for normal soils, 1,200J for compact or clay.
Frequency (950J)
620–1,500 bpm
Adapts to load and ground.
Frequency (1,200J)
570–1,180 bpm
Slightly lower due to heavier ram.
Hammer weight
350 kg (950J) / 450 kg (1,200J)
Mass tuned for penetration and reliability.
Circuit
Open, proportional gear pump
Proven reliability and fine control.
System pressure
180 bar
Balanced force and efficiency.
Oil flow (950J)
60–90 L/min
Adapts to workload.
Oil flow (1,200J)
70–100 L/min
Higher flow for the heavier hammer.
Tank
140 L
Cooling and runtime headroom.
Length
2,100 mm
Compact for tight access.
Width
2,350 mm
Stable stance on slopes.
Height
2,670 mm (mast raised)
Fits standard transport clearances.
Weight
4,500 kg
Standard 5 t trailer.
Working heights
4.40 m / 5.20 m / 6.00 m (with extensions)
Configurable depth; 6 m covers 95% of projects.
Side tilt
±9.5°
Accurate placement on slopes.
Front tilt
+10° / -51°
Versatile positioning.
Track speed
1.92 – 3.33 km/h
Fast moves between posts, fine control on the pile.
Piles per day
150+
Typical site figure. Best conditions exceed 200/day.
Maximum depth
Up to 6 m
Set via mast extensions.
Setup time
15 minutes
From trailer offload to first pile.
Operators
1
Wireless remote for full ground control.
Build your TURCHI 300F. Exactly how you want it.
7 steps to configure the right machine for your jobsite.
Options & configurations
Drilling
Head rotation
Remote control
Laser & positioning
Testing & certification
Telemetry
Mobility
Other
Your investment is protected.
Why choose the TURCHI 300F
Piles per day
Operators required
Setup time
Maximum depth
Cost per pile
Sector versatility
Indicative comparison based on typical site conditions.
We don't say it. Job sites do.
0
Machines delivered
0
Countries worldwide
0
Years of experience
0
Piles per day from customers
"We halved install time. The 300F let us finish a 2 MW plant in just 8 days. ROI was obvious from the first site."
Marco R.
Operations Director
EPC Solare — Veneto
"100 guardrail posts a day with one operator. We used to need three and did half the work. Site close-out times dropped sharply."
Giovanni P.
Site Manager
Infrastrutture Stradali SpA — Lombardy
"Ease of use is incredible. We trained a new operator in half a day. The machine paid for itself in under six months."
Alessandro B.
Project Manager
Solar Engineering Group — Puglia
"After-sales makes the difference. Part in 24 hours, tech on site the next day. Zero downtime."
Roberto F.
Technical Director
Strade Sicure Srl — Emilia-Romagna
‹ Drag to scroll ›
FREQUENTLY ASKED QUESTIONS
Everything about the TURCHI 300F
Answers to the most common questions about our flagship model.



