- Machine type
- Self-propelled tracked
- Working height
- 3.5 m
- Weight
- 3,500 kg
- Impact energy
- 950 / 1,200 / 1,500 J
- System pressure
- 170 bar
- Front tilt
- +10° / -51°
- Side tilt
- ±10°
Solar plants of 1-2 MW and road sites
TURCHI hydraulic pile drivers install up to 100 sigma posts per day with one operator. EN 1317 compliant, ready for recovery-funded sites. From ring roads to motorways — close the site sooner, safely.
CEF Transport funding, EN 1317 requirements and Vision Zero targets are driving the strongest guardrail demand in 20 years.
€25.8 bn
Connecting Europe Facility — Transport 2021–2027
EU funding for road corridors, safety upgrades and cross-border infrastructure.
€960M
European guardrail market expected by 2030
From €665M in 2024. Steady growth driven by standards and network maintenance.
EN 1317
The mandatory standard for every installation
Depth, alignment and post integrity certified. TURCHI pile drivers support compliance.
Sources: European Commission CEF 2021–2027, ETSC 2025, EU Vision Zero 2030
We do not sell machines. We sell sites closed before penalties hit.
100
sigma posts/day
With the TURCHI 260F on standard soil. A kilometre of guardrail finished in hours.
1
operator
One person runs driving from the ground. The rest of the crew mounts the beam.
15
minutes setup
From trailer offload to first post driven. No dead time at shift start.
€2-5
cost per post
Including operator, fuel and depreciation. Up to 65% less than manual methods.
EN 1317
compliance built in
Constant depth, perfect verticality, no damage to the post head. Every install to spec.
98%
average uptime
Built to keep running. If something happens, we respond within 1 hour across Europe.
100+
guardrails/day
1 km+
guardrail per day
On motorway jobs where every day of delay means thousands in penalties and traffic management, driving speed is everything. The TURCHI 260F drives up to 100 sigma posts per day with one operator, freeing the crew for W-beam installation. Result: more km per shift, fewer lane-closure days, fewer penalties.
Discover the 260F for motorways
100+
guardrails/day
1,400 kg
minimum weight
On provincial and municipal roads space is tight, access is narrow and traffic is often present. The truck-mounted TURCHI 160 arrives with the site vehicle, positions and starts driving without dedicated transport. Available as CA (autonomous power unit) or PF (PTO-driven from the truck gearbox).
Discover the 160 for local roads
100+
guardrails/day in replacement
50%
time cut vs manual
Maintenance and renewal of existing barriers is a growing share of road work. With a TURCHI pile driver, old post extraction and new post driving happen in sequence without changing machine. Hydraulic precision limits pavement damage and cuts reinstatement.
Contact a TURCHI expert
How a TURCHI pile driver accelerates every road jobsite.
01
The TURCHI machine positions along the line. Self-propelled on tracks or truck-mounted — matched to the job type.
02
The column's frontal adjustment (+10°) and the sliding guide place the sigma post exactly; the frontal −51° is for transport. Optional GPS for millimetre alignment.
03
The hydraulic hammer drives the sigma post to EN 1317 depth. Perfect verticality, no head damage. Seconds per post.
04
The machine moves to the next post. With the pile trolley, supply is continuous. The crew mounts W-beam right behind.
Custom templates for Sigma, H, C, U posts on all models. Fast profile change without tools.
Solar plants of 1-2 MW and road sites
Guardrails and mobile sites
Photovoltaic and road sites
Contract
SP barrier renewal (ex-SS)
Location
Campania, Italy
Guardrail installed
12 km
Duration
18 working days
Machine
TURCHI 260F + trolley
Driving operators
1
“We had to finish in 25 days to avoid the penalty. With the TURCHI 260F we closed in 18. The margin on that job paid back half the machine.”
| Metric | TURCHI (300F / 160) | Manual / excavator | Advantage |
|---|---|---|---|
| Sigma posts per day | ✓ 80-100 | ✗ 60-100 | 4× faster |
| Operators for driving | ✓ 1 | ✗ 2-3 | 65% fewer people |
| Setup time | ✓ 15 min | ✗ 45–90 min | 5× faster |
| Cost per post | ✓ €2-5 | ✗ €8-15 | Up to 65% saving |
| EN 1317 compliance | ✓ Constant depth & verticality | ✗ Variable, to verify | Simpler certification |
| Post head damage | ✓ Zero (hydraulic guide) | ✗ Common (drop weight) | Less scrap and rework |
| Km guardrail/week | ✓ 3–5 km | ✗ 0.5–1.5 km | Deliver 3× sooner |
Indicative comparison for guardrail on standard soil with sigma profile. Results vary with ground and driving depth.
Want a comparison for your contract?
In guardrail work, delays mean penalties and lane reductions. Our support targets zero machine downtime.
From report to action, never more than 1 hour. Anywhere in Europe.
Genuine parts within 48 hours in any European country.
Real-time diagnostics via app. Often fixed remotely before the tech arrives.
Your crew productive in half a day. Training included with delivery.
1,500
Machines delivered
55
Countries worldwide
53
Years of experience
10,000
km of guardrail installed with TURCHI machines
Configure the pile driver for your contract, request a tailored quote, or speak directly with a TURCHI expert.