Turchi
    Turchi

    TURCHI · Self-propelled hydraulic pile drivers

    Compact. Powerful. Unstoppable.

    TURCHI 260F — the compact pile driver for road and urban sites wherever space is tight. It pays back from the first job.

    up to 150 piles/dayup to 3.5 m depthfrom 3,500 kg
    Configure your TURCHI 260F
    TURCHI 260F self-propelled hydraulic pile driver on a road site

    150+

    Guardrail posts per day

    With one operator, even in urban areas

    3.5 m

    Maximum depth

    Ideal for guardrail, sigma posts and solar

    10 min

    Setup — ready fast

    From trailer to first pile in minutes

    1

    Operator — does the work of three

    Compact does not mean compromise.

    The TURCHI 260F proves power and compactness can coexist. At just 3,500 kg and a small footprint (1.93 × 2.20 m), it reaches urban road sites larger machines cannot — without giving up productivity.

    One operator installs 80–100 guardrail posts per day. Setup takes 10 minutes. Depth reaches 3.5 m. Transport is on a light trailer with no special vehicle. These numbers come from 53 years of TURCHI experience.

    Built for road work and cities, the 260F also excels at mid-scale solar. The smart choice when you want ROI without overspending.

    The compact machine demanding road contractors choose for urban sites where space matters.
    TURCHI 260F on a solar farm site

    One compact machine. Two sectors. Zero compromise.

    Up to 150 guardrail piles per day with one operator

    Up to 150 guardrail piles per day with one operator

    150

    piles/day

    50%

    lower costs

    For road applications, the TURCHI 260F drives sigma and guardrail posts with speed and precision. Its size fits tight sites and cities. Side tilt up to ±9.5° and front tilt up to +10°/-51° ensure accurate placement.

    Configure for road

    How it works. As simple as it looks.

    Four intuitive steps from zero to productive.

    1

    Position

    Move the machine to the first pile using simplified controls.

    2

    Align

    Set tilt (±9.5° side, +10°/-51° front) in seconds.

    3

    Drive

    Run the hammer and watch the pile reach depth.

    4

    Move on

    Go to the next pile and repeat. That is it.

    No special training required. Intuitive from day one. With optional wireless remote, full control from anywhere.

    Full technical specifications

    The numbers that matter, explained.

    Type

    Diesel 3–4 cylinder, liquid cooled

    Compact, reliable engine balancing power and fuel use.

    Displacement

    1,800 — 2,190 cm³

    3 or 4 cylinders depending on engine option.

    Power

    34.4 kW (46 HP) @ 3,000 rpm

    Tuned for productivity and efficiency.

    Emissions

    Euro 5 / Tier 5

    Meets current regulations.

    Build your TURCHI 260F. Tailored to your site.

    7 steps to configure the right machine for your needs.

    1
    Choose the hammer950J or 1,200J?
    2
    Set the mastDepth and height
    3
    Pile profileH, C, U, Sigma
    4
    AccessoriesGPS, remote, verticality
    5
    Colour and brandingCustomisation
    6
    After-salesWarranty and support
    7
    Final quotePrice and lead time
    Start configuring

    Options & configurations

    Drilling

    Head rotation

    Remote control

    Laser & positioning

    Testing & certification

    Telemetry

    Mobility

    Other

    Your investment is protected.

    1hMaximum response time
    48hSpare parts delivery anywhere in Europe
    98%Average machine uptime
    100%Always genuine certified parts

    Why choose the TURCHI 260F

    Piles per day

    TURCHI 260F 150+
    Others 50–80

    Operators required

    TURCHI 260F 1
    Others 3–4

    Setup time

    TURCHI 260F 10 min
    Others 2+ hours

    Maximum depth

    TURCHI 260F 3.5 m
    Others 2–3 m

    Cost per pile

    TURCHI 260F €2–3
    Others €8–12

    Transport

    TURCHI 260F Light trailer
    Others Special vehicle

    Indicative comparison based on typical site conditions.

    We don't say it. Job sites do.

    0

    Machines delivered

    0

    Countries worldwide

    0

    Years of experience

    0

    Piles per day from customers

    Solar

    "The 260F is perfect for our mid-scale plants. Compact, fast, and it goes on a standard trailer. We cut logistics costs by 40%."

    Andrea T.

    Site Manager

    Solar EPC — Central Italy

    Fencing

    "150 piles a day on Tuscan hills. Clients did not believe it until they saw it. Now they call us from across the region."

    Paolo M.

    Owner

    Fencing contractor — Tuscany

    Solar

    "We needed a machine that fits tight rows between trackers. The 260F does exactly that without slowing driving speed."

    Elena V.

    Project Manager

    Agri-solar EPC — Southern Italy

    Road

    "In the city you cannot bring huge machines. The 260F goes everywhere, does the work of a bigger rig, and moves in no time."

    Luca D.

    Technical Director

    Road contractor — Northern Italy

    Fencing

    "Unbeatable value. The machine paid for itself in four months. TURCHI support is always there when needed."

    Stefano B.

    Operations Lead

    Agricultural contractor — Emilia-Romagna

    ‹ Drag to scroll ›

    FREQUENTLY ASKED QUESTIONS

    Everything about the TURCHI 260F

    Answers to the most common questions about our compact, versatile machine.

    How many piles per day can the TURCHI 260F drive?
    On typical ground, the 260F exceeds 150 piles per day for guardrail and up to 150 solar piles per day. On clay or compact soils, expect roughly 60–100 piles/day.
    What is the main difference between the 260F and 300F?
    The 260F is more compact (3,500 kg vs 4,500 kg), ideal for sites with restricted access. The 300F is more powerful and reaches greater depth (up to 6 m vs 3.5 m). Both models support pile driving and screwing. Choose based on your site.
    Can the 260F screw screw piles?
    Yes. The entire TURCHI range supports both driving and screwing. An optional hydraulic screw head installs screw piles for fencing, vineyards and special foundations.
    Which pile profiles are compatible?
    The 260F supports H, C, U and Sigma profiles. Shoes are customisable per site. Quick changeovers take minutes.
    How is the machine transported?
    At 3,500 kg, the 260F fits a standard 3.5 t trailer. Compact dimensions suit sites with limited access.
    Does the operator need special training?
    No. The 260F is designed to be intuitive. Training can be done in half a day. A wireless remote is optional for distance control.
    What are delivery lead times?
    They depend on configuration and production schedule. Contact us for the next available slot.
    What after-sales support do you offer?
    Response in 15 minutes, spare parts in 48 hours across Europe, 98% average uptime. All parts are genuine and certified.
    logo

    We (www.turchi.pr.it) and selected third parties (3) use cookies or similar technologies for technical purposes and, with your consent, for measurement and “marketing (personalised ads)” as specified in the cookie policy.

    You can freely give, deny, or withdraw your consent at any time by accessing the preferences panel. Denying consent may make related features unavailable.

    Use the “Accept” button to consent.