Compact. Powerful. Unstoppable.
TURCHI 260F — the compact pile driver for road and urban sites wherever space is tight. It pays back from the first job.
150
Piles per day: indicative average
With short piles; 200-300 in optimal conditions
3.5 m
Working height
Maximum height with the standard mast extension
10 min
Setup — ready fast
From trailer to first pile in minutes
1
Operator — does the work of three
Compact does not mean compromise.
The TURCHI 260F proves power and compactness can coexist. At just 3,500 kg and a small footprint (1.93 × 2.20 m), it reaches urban road sites larger machines cannot — without giving up productivity.
One operator runs the machine. With short piles, 150 piles/day is an indicative average, not a minimum or a maximum; 200-300 are possible in optimal conditions. Setup takes 10 minutes. Pile-driving height reaches 3.5 m with the standard mast extension. Transport is on a light trailer with no special vehicle. These numbers come from 53 years of TURCHI experience.
Built for road work and cities, the 260F also excels at mid-scale solar. The smart choice when you want ROI without overspending.
The compact machine demanding road contractors choose for urban sites where space matters.
One compact machine. Two sectors. Zero compromise.

Guardrail pile driving in tight spaces
150
piles/day: average with short piles
50%
lower costs
For road applications, the TURCHI 260F drives sigma and guardrail posts with speed and precision. Its size fits tight sites and cities. The mast adjusts ±10° sideways and +10° frontally; the frontal -51° is for transport, not work. These angles do not indicate a safe working slope.
Configure for road
Pile driving for ground-mount solar plants
150
piles/day: average with short piles
3.5 m
working height
The TURCHI 260F is aimed at road work, but also works in solar. Maximum pile-driving height is 3.5 m with the standard mast extension. H, C, U and Sigma profiles and other profiles need suitable shoes; pile height and ground matter when choosing the model. With short piles, 150 piles/day is an indicative average; 200-300 are possible in optimal conditions. Timelines are estimated on the project, not on MW alone.
Configure for solarHow it works. As simple as it looks.
Four intuitive steps from zero to productive.
Position
Move the machine to the first pile using simplified controls.
Align
Adjust the mast: ±10° sideways, +10° frontally. The frontal -51° is for transport, not work; these are not safe slope limits.
Drive
Run the hammer and watch the pile reach depth.
Move on
Go to the next pile and repeat. That is it.
No special training required. Intuitive from day one. With optional wireless remote, full control from anywhere.
Full technical specifications
The numbers that matter, explained.
Type
Diesel 3–4 cylinder, liquid cooled
Compact, reliable engine balancing power and fuel use.
Displacement
1,800 — 2,190 cm³
3 or 4 cylinders depending on engine option.
Power
34.4 kW (46 HP) @ 3,000 rpm — 41 kW (56 HP) @ 2,500 rpm
Tuned for productivity and efficiency.
Emissions
Euro 5 / Tier 5
Meets current regulations.
Impact energy
950 J / 1,200 J / 1,500 J (selectable)
950J for normal soils, 1,200J for compact or clay, 1,500J for very hard or rocky soils.
Frequency
620–1,500 bpm (950J) — 570–1,180 bpm (1,200J) — 520–1,050 bpm (1,500J)
Adapts to load and ground; slightly lower due to heavier ram.
Hammer weight
350 kg (950J) / 450 kg (1,200J) / 450 kg (1,500J)
Mass tuned for penetration and durability.
Circuit
Open, proportional gear pump
Proven reliability and fine control.
System pressure
170 bar
Balanced force and efficiency.
Oil flow
60–90 L/min
Adapts to workload.
Tank
120 L
Adequate cooling and runtime.
Length
1,930 mm
Ultra-compact for tight access.
Width
2,200 mm
Small footprint for urban sites.
Height
2,600 mm
Low profile for easy transport.
Weight
3,500 kg
Standard light trailer — no special truck required.
Working height
3.50 m
Maximum pile-driving height with the standard mast extension, not the extension length.
Side tilt
±10°
Mast adjustment, not a safe slope limit.
Front tilt
+10° / -51°
+10° for mast adjustment; -51° for transport, not work.
In/out stroke
600 mm
Fine alignment without moving the carrier.
Track speed
2.12 km/h
Rubber tracks, low ground impact.
Piles per day: indicative average
150
With short piles; not a guaranteed minimum or maximum. 200-300 piles/day are possible in optimal conditions.
Working height
Up to 3.5 m
Maximum pile-driving height with the standard mast extension, not the extension length.
Setup time
10 minutes
From trailer offload to first pile.
Operators
1
Optional remote for full ground control.
Build your TURCHI 260F. Tailored to your site.
7 steps to configure the right machine for your needs.
Options & configurations
Drilling
Head rotation
Remote control
Laser & positioning
Testing & certification
Telemetry
Mobility
Other
Your investment is protected.
Why choose the TURCHI 260F
Piles per day: average with short piles
Operators required
Setup time
Working height
Cost per pile
Transport
Indicative comparison based on typical site conditions.
We don't say it. Job sites do.
1500
Machines delivered
55
Countries worldwide
53
Years of experience
250
Piles/day possible in optimal conditions
‹ Drag to scroll ›
Frequently asked questions
Can't find what you're looking for? Browse the full FAQ list . Reach out via a support request or email us at commerciale@turchi.pr.it.
On repetitive work with short piles, 150 piles per day is an indicative average, neither a minimum nor a ceiling. In optimal conditions 200-300 piles per day can be reached; guardrail, solar, ground, pile height and site logistics change the real output. An estimate needs the job data.
The TURCHI 260F is more compact (3,500 kg versus 4,400 kg) and is aimed at road sites and tight access; the 300F is aimed at large solar sites. The 260F drives piles to 3.5 m, the 300F reaches 6 m. Both can also work in the other sector and carry hammers from the same range: the choice depends on the pile and the site conditions.
The catalogued configuration of the TURCHI 260F is for driving and does not include screwing. If your project requires screw piles, send us the specifications: the technical team will check whether a suitable set-up exists, without promising the function as a standard option.
The TURCHI 260F works with the common H, C, U and Sigma profiles and can be fitted with custom shoes for other profiles. With the standard mast extension, maximum pile-driving height is 3.5 metres: pile height and ground matter more than the profile name when choosing the machine. Send us the pile drawing so we can prepare the shoes.
The TURCHI 260F weighs 3,500 kg in working order. Trailer payload, transported equipment, dimensions of the chosen configuration and site access must be checked together; the machine's weight alone is not enough to confirm that a 3.5 t trailer is suitable.
No. The 260F is designed to be intuitive. Training can be done in half a day. A wireless remote is optional for distance control.
They depend on configuration and production schedule. Contact us for the next available slot.
Response in 15 minutes, spare parts in 48 hours across Europe, 98% average uptime. All parts are genuine and certified.