Skip to main content

Compact. Powerful. Unstoppable.

TURCHI 260F — the compact pile driver for road and urban sites wherever space is tight. It pays back from the first job.

150 piles/day: average with short piles pile-driving height up to 3.5 m with standard extension from 3,500 kg
TURCHI 260F self-propelled hydraulic pile driver on a road site

150

Piles per day: indicative average

With short piles; 200-300 in optimal conditions

3.5 m

Working height

Maximum height with the standard mast extension

10 min

Setup — ready fast

From trailer to first pile in minutes

1

Operator — does the work of three

Compact does not mean compromise.

The TURCHI 260F proves power and compactness can coexist. At just 3,500 kg and a small footprint (1.93 × 2.20 m), it reaches urban road sites larger machines cannot — without giving up productivity.

One operator runs the machine. With short piles, 150 piles/day is an indicative average, not a minimum or a maximum; 200-300 are possible in optimal conditions. Setup takes 10 minutes. Pile-driving height reaches 3.5 m with the standard mast extension. Transport is on a light trailer with no special vehicle. These numbers come from 53 years of TURCHI experience.

Built for road work and cities, the 260F also excels at mid-scale solar. The smart choice when you want ROI without overspending.

The compact machine demanding road contractors choose for urban sites where space matters.
TURCHI 260F on a solar farm site

One compact machine. Two sectors. Zero compromise.

Guardrail pile driving in tight spaces

Guardrail pile driving in tight spaces

150

piles/day: average with short piles

50%

lower costs

For road applications, the TURCHI 260F drives sigma and guardrail posts with speed and precision. Its size fits tight sites and cities. The mast adjusts ±10° sideways and +10° frontally; the frontal -51° is for transport, not work. These angles do not indicate a safe working slope.

Configure for road

How it works. As simple as it looks.

Four intuitive steps from zero to productive.

1

Position

Move the machine to the first pile using simplified controls.

2

Align

Adjust the mast: ±10° sideways, +10° frontally. The frontal -51° is for transport, not work; these are not safe slope limits.

3

Drive

Run the hammer and watch the pile reach depth.

4

Move on

Go to the next pile and repeat. That is it.

No special training required. Intuitive from day one. With optional wireless remote, full control from anywhere.

Full technical specifications

The numbers that matter, explained.

Type

Diesel 3–4 cylinder, liquid cooled

Compact, reliable engine balancing power and fuel use.

Displacement

1,800 — 2,190 cm³

3 or 4 cylinders depending on engine option.

Power

34.4 kW (46 HP) @ 3,000 rpm — 41 kW (56 HP) @ 2,500 rpm

Tuned for productivity and efficiency.

Emissions

Euro 5 / Tier 5

Meets current regulations.

Impact energy

950 J / 1,200 J / 1,500 J (selectable)

950J for normal soils, 1,200J for compact or clay, 1,500J for very hard or rocky soils.

Frequency

620–1,500 bpm (950J) — 570–1,180 bpm (1,200J) — 520–1,050 bpm (1,500J)

Adapts to load and ground; slightly lower due to heavier ram.

Hammer weight

350 kg (950J) / 450 kg (1,200J) / 450 kg (1,500J)

Mass tuned for penetration and durability.

Circuit

Open, proportional gear pump

Proven reliability and fine control.

System pressure

170 bar

Balanced force and efficiency.

Oil flow

60–90 L/min

Adapts to workload.

Tank

120 L

Adequate cooling and runtime.

Length

1,930 mm

Ultra-compact for tight access.

Width

2,200 mm

Small footprint for urban sites.

Height

2,600 mm

Low profile for easy transport.

Weight

3,500 kg

Standard light trailer — no special truck required.

Working height

3.50 m

Maximum pile-driving height with the standard mast extension, not the extension length.

Side tilt

±10°

Mast adjustment, not a safe slope limit.

Front tilt

+10° / -51°

+10° for mast adjustment; -51° for transport, not work.

In/out stroke

600 mm

Fine alignment without moving the carrier.

Track speed

2.12 km/h

Rubber tracks, low ground impact.

Piles per day: indicative average

150

With short piles; not a guaranteed minimum or maximum. 200-300 piles/day are possible in optimal conditions.

Working height

Up to 3.5 m

Maximum pile-driving height with the standard mast extension, not the extension length.

Setup time

10 minutes

From trailer offload to first pile.

Operators

1

Optional remote for full ground control.

Build your TURCHI 260F. Tailored to your site.

7 steps to configure the right machine for your needs.

1
Choose the hammer 950J, 1,200J or 1,500J?
2
Set the mast Working height
3
Pile profile H, C, U, Sigma
4
Accessories GPS, remote, verticality
5
Colour and branding Customisation
6
After-sales Warranty and support
7
Final quote Price and lead time
Start configuring

Options & configurations

Drilling

Head rotation

Remote control

Laser & positioning

Testing & certification

Telemetry

Mobility

Other

Your investment is protected.

1h Maximum response time
48h Spare parts delivery anywhere in Europe
98% Average machine uptime
100% Always genuine certified parts

Why choose the TURCHI 260F

Piles per day: average with short piles

TURCHI 260F 150
Others 50–80

Operators required

TURCHI 260F 1
Others 3–4

Setup time

TURCHI 260F 10 min
Others 2+ hours

Working height

TURCHI 260F 3.5 m
Others 2–3 m

Cost per pile

TURCHI 260F €2–3
Others €8–12

Transport

TURCHI 260F Light trailer
Others Special vehicle

Indicative comparison based on typical site conditions.

We don't say it. Job sites do.

1500

Machines delivered

55

Countries worldwide

53

Years of experience

250

Piles/day possible in optimal conditions

Solar

"The 260F is perfect for our mid-scale plants. Compact, fast, and it goes on a standard trailer. We cut logistics costs by 40%."

Andrea T.

Site Manager

Solar EPC — Central Italy

Fencing

"150 piles a day on Tuscan hills. Clients did not believe it until they saw it. Now they call us from across the region."

Paolo M.

Owner

Fencing contractor — Tuscany

Solar

"We needed a machine that fits tight rows between trackers. The 260F does exactly that without slowing driving speed."

Elena V.

Project Manager

Agri-solar EPC — Southern Italy

Road

"In the city you cannot bring huge machines. The 260F goes everywhere, does the work of a bigger rig, and moves in no time."

Luca D.

Technical Director

Road contractor — Northern Italy

Fencing

"Unbeatable value. The machine paid for itself in four months. TURCHI support is always there when needed."

Stefano B.

Operations Lead

Agricultural contractor — Emilia-Romagna

‹ Drag to scroll ›

Frequently asked questions

Can't find what you're looking for? Browse the full FAQ list . Reach out via a support request or email us at commerciale@turchi.pr.it.

On repetitive work with short piles, 150 piles per day is an indicative average, neither a minimum nor a ceiling. In optimal conditions 200-300 piles per day can be reached; guardrail, solar, ground, pile height and site logistics change the real output. An estimate needs the job data.

The TURCHI 260F is more compact (3,500 kg versus 4,400 kg) and is aimed at road sites and tight access; the 300F is aimed at large solar sites. The 260F drives piles to 3.5 m, the 300F reaches 6 m. Both can also work in the other sector and carry hammers from the same range: the choice depends on the pile and the site conditions.