- Machine type
- Self-propelled tracked
- Working height
- 6 m
- Weight
- 4,400 kg
- Impact energy
- 950 / 1,200 / 1,500 J
- System pressure
- 180 bar
- Front tilt
- +10° / -51°
- Side tilt
- ±10°
Solar plants of 3+ MW and large projects
TURCHI hydraulic pile drivers drive an average of 150 short piles per day with a single operator. Fifteen-minute setup, zero standing time. The choice of EPC contractors who deliver on time and on budget — from Italy to Romania, Spain to Poland.
Whoever drives piles faster wins more contracts.
406 GW
Solar capacity installed across the EU (end of 2025)
A record market demanding fast, efficient, scalable pile driving on every new ground-mount project.
+65 GW
New capacity installed in the EU in 2025
Millions of piles every year. The machine that drives faster wins more contracts.
30+
EU-27 target by 2030 (REPowerEU)
The ground-mount segment drives most of this growth. Turchi is already present in every key market.
Source: SolarPower Europe EU Market Outlook 2025, IEA Renewables 2025, REPowerEU
We do not sell machines. We sell sites delivered on time.
150
piles/day
Indicative average for the TURCHI 300F with short piles; 200-300 in optimal conditions. Plant timelines are estimated on the project.
1
operator
One person runs the full driving cycle. Your team can cover multiple sites in parallel.
15
minutes setup
From trailer offload to first pile driven. No dead time at shift start.
€2-4
cost per post
Including operator, fuel and depreciation. Up to 70% less than traditional methods.
6 m
maximum height
Pile-driving height up to 6 m depending on configuration; the ground must be checked on site.
98%
average uptime
Built to keep running. If something happens, we respond within 1 hour across Europe.
How a TURCHI pile driver transforms your solar jobsite.
01
The pile driver arrives on a standard trailer (no special transport). Offload, position and start in under 15 minutes.
02
Optional GPS guides the operator to the exact coordinates of each pile. Zero positioning errors, no rework.
03
The 950–1,500 J hammer drives each pile in seconds, even in clay and compact soils. The operator works entirely from the ground.
04
The machine moves to the next pile via radio remote control, with no stops between one drive and the next.
Semi-automatic GPS, assisted verticality and remote monitoring are available as options on all models.
Solar plants of 3+ MW and large projects
Solar plants of 1-2 MW and road sites
How two operators completed ~1,850 piles in 12 days using a TURCHI 300F
“With the TURCHI 300F we handed over the site three days ahead of schedule. The client awarded us the second lot directly.”
Original (Romanian)
“Cu TURCHI 300F am predat șantierul cu 3 zile mai devreme față de graficul de execuție. Clientul ne-a încredințat direct al doilea lot.”
| Metric | TURCHI 300F | Manual / excavator | Advantage |
|---|---|---|---|
| Piles per day | ✓ 150 (average, short piles) | ✗ 80-120 | More piles per operator |
| Operators required | ✓ 1 | ✗ 3-4 | 75% fewer people |
| Setup time | ✓ 15 min | ✗ 1–2 h | 8× faster |
| Cost per post | ✓ €2-4 | ✗ €8-15 | Up to 70% saving |
| Positioning accuracy | ✓ GPS ±5 mm | ✗ Manual ±50 mm | 10× more accurate |
| Max depth | ✓ 6 m | ✗ 3–4 m | More applications covered |
Indicative comparison based on ground-mounted PV on standard soil. Results vary with ground conditions, pile depth and profile type.
Want a comparison tailored to your site?
In solar, delays mean penalties. Our support is built to keep you running.
From report to action, never more than 1 hour. Anywhere in Europe.
Genuine parts within 48 hours in any European country.
Real-time diagnostics via app. Often fixed remotely before the tech arrives.
Your crew productive in half a day. Training included with delivery.
1500+
Machines delivered
55
Countries worldwide
53
Years of experience
2000+
MW installed with TURCHI machines
Configure the pile driver for your plant or request a tailored quote.