TURCHI · Solar sector
Complete your solar plant in half the time.
TURCHI hydraulic pile drivers install up to 150 piles per day with a single operator. Fifteen-minute setup, zero standing time. The choice of EPC contractors who deliver on time and on budget — from Italy to Romania, Spain to Poland.

The European solar market keeps accelerating.
Whoever drives piles faster wins more contracts.
406 GW
Solar capacity installed across the EU (end of 2025)
A record market demanding fast, efficient, scalable pile driving on every new ground-mount project.
+65 GW
New capacity installed in the EU in 2025
Millions of piles every year. The machine that drives faster wins more contracts.
750 GW
EU-27 target by 2030 (REPowerEU)
The ground-mount segment drives most of this growth. Turchi is already present in every key market.
Source: SolarPower Europe EU Market Outlook 2025, IEA Renewables 2025, REPowerEU
Why EPC contractors choose TURCHI.
We do not sell machines. We sell sites delivered on time.
150+
piles/day
With the TURCHI 300F on standard soil. A 1 MW plant finished in under a week.
1
operator
One person runs the full driving cycle. Your team can cover multiple sites in parallel.
15
minutes setup
From trailer offload to first pile driven. No dead time at shift start.
€2-4
cost per pile
Including operator, fuel and depreciation. Up to 70% less than traditional methods.
6 m
maximum depth
Covers 95% of European solar installs, including clay and rocky soils.
98%
average uptime
Built to keep running. If something happens, we respond within 1 hour across Europe.
From trailer to first pile in 15 minutes.
How a TURCHI pile driver transforms your solar jobsite.
01
Transport & setup
The pile driver arrives on a standard trailer (no special transport). Offload, position and start in under 15 minutes.
02
GPS positioning
Optional GPS guides the operator to the exact coordinates of each pile. Zero positioning errors, no rework.
03
Automatic driving
The 950–1,200 J hammer drives each pile in seconds, even in clay and compact soils. The operator works entirely from the ground.
04
Continuous advance
The machine moves to the next pile via radio remote control. With the pile trolley, resupply is continuous — zero downtime.
Semi-automatic GPS, assisted verticality and remote monitoring are available as options on all models.
The right machine for your plant.
Three TURCHI pile drivers built for solar — from 100 kW sites to 50 MW parks.

TURCHI 300F
The solar flagship
- Up to 150+ piles/day
- Depth up to 6 m
- Integrated semi-automatic GPS
- Weight: 4,500 kg — standard trailer
Plants from 1 MW upward. Sites where speed is everything.

TURCHI 260F
Compact and powerful
- Up to 100 piles/day
- Depth up to 3.5 m
- Weight: 3,500 kg — highly portable
- Ideal for standard soils
Plants up to 1 MW. Limited access or easy ground conditions.

Pile trolley
The partner that multiplies productivity
- 2,000 kg payload
- +30–40% site productivity
- Zero pile-driver idle time
- Walk-behind remote control
Large linear sites where pile logistics is the bottleneck.
CASE STUDY
5,000 piles in 12 working days. One operator. Zero machine stops.
Plant
3 MW ground-mounted
Location
Romania
Piles driven
5,000
Duration
12 working days
Machine
TURCHI 300F + trolley
Operator
1
“With the TURCHI 300F we handed over the site three days ahead of schedule. The client awarded us the second lot directly.”

TURCHI vs traditional methods: the numbers.
| Metric | TURCHI 300F | Manual / excavator | Advantage |
|---|---|---|---|
| Piles per day | ✓ 150+ | ✗ 80–120 | 4× faster |
| Operators required | ✓ 1 | ✗ 3–4 | 75% fewer people |
| Setup time | ✓ 15 min | ✗ 1–2 h | 8× faster |
| Cost per pile | ✓ €2–4 | ✗ €8–15 | Up to 70% saving |
| Positioning accuracy | ✓ GPS ±5 mm | ✗ Manual ±50 mm | 10× more accurate |
| Max depth | ✓ 6 m | ✗ 3–4 m | More applications covered |
| Time for 1 MW (~500 piles) | ✓ 4–5 days | ✗ 17–25 days | Deliver 4× sooner |
Indicative comparison based on ground-mounted PV on standard soil. Results vary with ground conditions, pile depth and profile type.
Want a comparison tailored to your site?
Dedicated support for solar.
In solar, delays mean penalties. Our support is built to keep you running.
Response in 15 min
From ticket to action, never more than 1 hour. Anywhere in Europe.
Spare parts in 48h
Genuine parts delivered within 48 hours in any European country.
Remote support
Real-time diagnostics via app. Often fixed remotely before a tech arrives.
Operator training
Your crew productive in half a day. Training included with delivery.
0+
Machines delivered
0
Countries worldwide
0
Years of experience
0+
MW installed with TURCHI machines
‹ Drag to scroll ›
Your next solar site starts here.
Configure the pile driver for your plant or request a tailored quote.


