Skip to main content
ROI & Business

Pile driver hire vs purchase: costs and breakeven

Direct costs, transport, maintenance, breakeven and an EPC scenario: figures and conditions for choosing between hiring and buying a pile driver.

4 min read
TURCHI pile drivers ready for delivery in the factory yard

The choice between hiring and buying a pile driver depends on the days of use per year and the actual daily cost.

The comparison includes transport, availability, maintenance, residual value, tax treatment and an EPC scenario with 90 days of use per year.

Pile driver hire vs purchase: direct costs

The comparison covers a tracked self-propelled pile driver. Costs are indicative. For a personalised calculation, open the configurator and request a simulation for your volumes.

  • Advantage
  • Disadvantage
  • Depends on the case
Pile driver hire vs purchase: direct costs
Factor Hire Purchase
Daily cost Hire Depends on the case: From €1,000/day with operator Purchase Depends on the case: Amortised over time
Transport Hire Disadvantage: €500-1,500 per leg, your cost Purchase Advantage: Once only
Availability Hire Disadvantage: Limited in peak periods Purchase Advantage: Always ready
Maintenance Hire Disadvantage: Not guaranteed Purchase Advantage: Scheduled and certified
Residual value Hire Disadvantage: Zero Purchase Advantage: Significant after 5 years
Tax deductibility Hire Disadvantage: Hire charge only Purchase Advantage: Depreciation and 180% hyper-depreciation
Additional revenue Hire Disadvantage: No Purchase Advantage: Subcontracting possible
Quality control Hire Depends on the case: Depends on hire provider Purchase Advantage: Full

Additional hire costs

Hire can add the following costs to the daily rate:

  • return transport: €500-1,500 per leg for every site;
  • additional insurance required by the hire provider;
  • weather stoppages, with payment continuing if the machine cannot be returned;
  • limited availability from April to October during the solar peak season;
  • no guarantee on machine quality and maintenance;
  • penalties for damage and wear.

With these items, effective daily cost can reach €1,500-2,000, or 50-100% above the base rate.

Costs and benefits of owning a TURCHI machine

Ownership adds operational control and residual value to the investment.

What you getDetail
After-sales support15-minute response, spare parts in 48 hours in Europe
Guaranteed uptimeOver 98%, the site does not stop
Made in ItalyProduced in Pilastro (PR), ISO 9001 certified quality
Industry 4.0 kitIncluded, for access to the 2026 hyper-depreciation
Sworn appraisalProvided by TURCHI for the tax procedure
Residual valueHigh after 5+ years with good maintenance
Online configuratorChoose the hammer, mast, GPS and accessories you need

Breakeven between hire and purchase

Breakeven compares annual ownership cost with annual hire cost:

ItemFormula
Annual purchase cost(Price / Depreciation years) + Annual running cost - (Residual value / Years)
Annual hire costEffective daily cost × Days of use
BreakevenWhen the two costs are equal

With indicative market values, breakeven falls between 40 and 60 days per year.

Estimated annual cost: hire, about €1,000 per effective day, versus purchase, about €200,000 amortised over 5 years. Indicative estimates, in €

At about €1,000 per effective day, hire costs €30,000 at 30 days per year, €60,000 at 60 days and €90,000 at 90 days. Purchase remains about €40,000 per year, or about €200,000 amortised over 5 years. Below about 40 days, hire is cheaper; above that threshold, purchase is.

Example with 80 days per year at €1,200 per effective day:

ItemHirePurchase
Year 1 cost€96,000Initial investment
Year 2 cost€96,000Running costs only
Year 3 cost€96,000Running costs only
3-year total€288,000Much lower
Residual value€0Significant

Revenue and operating benefits of ownership

An owned machine lets you offer pile-driving services to your own customers. Many solar EPCs and installers that bought a TURCHI pile driver have added a new line of business, working as subcontractors for colleagues without a machine.

Owners report these operating benefits:

  • no delay caused by hire provider unavailability;
  • the chance to accept last-minute, high-margin jobs;
  • direct control over work quality;
  • site planning free of outside availability constraints;
  • additional subcontracting revenue.

The 2026 hyper-depreciation, with a 180% uplift, can reduce the effective purchase cost by about 40%.

When hire pays off

  • Advantage
  • Disadvantage
  • Depends on the case
When hire pays off
Situation Hire Purchase
Under 30 days/year Hire Advantage: Cost-effective Purchase Disadvantage: Not justified
30-60 days/year Hire Depends on the case: To assess Purchase Depends on the case: To assess
Over 60 days/year Hire Disadvantage: Too expensive Purchase Advantage: Clearly cost-effective
Trial before purchase Hire Advantage: Useful Purchase Not applicable
One-off remote site Hire Advantage: Practical Purchase Disadvantage: Expensive transport

For regular use, purchase is almost always the better choice.

Scenario: solar EPC with 90 days per year

An EPC company specialising in 1-5 MW solar plants hires a machine at €1,200/day for 90 days per year:

  • Advantage
  • Disadvantage
Scenario: solar EPC with 90 days per year
Item Annual hire With TURCHI 300F
Operating cost Annual hire Disadvantage: ~€108,000 With TURCHI 300F Advantage: Much lower
Availability Annual hire Disadvantage: Uncertain in peak season With TURCHI 300F Advantage: Always guaranteed
Year-end value Annual hire Disadvantage: €0 With TURCHI 300F Advantage: Asset on balance sheet
Subcontracting possible Annual hire Disadvantage: No With TURCHI 300F Advantage: Yes, extra revenue
180% hyper-depreciation Annual hire Disadvantage: Not applicable With TURCHI 300F Advantage: Yes, tax saving over €40,000

To compare this scenario with your volumes, configure the TURCHI 300F for solar and use the 7-step configurator for an estimate based on your actual volumes.

In this article

Frequently asked questions

Can't find what you're looking for? Browse the full FAQ list. Reach out via a support request or email us at commerciale@turchi.pr.it.

Hire with an operator costs from roughly €1,000/day, depending on the area and machine. Effective costs, including transport and unexpected expenses, can be significantly higher.

Build your pile driver

Configure the perfect machine for your worksite in 7 steps, then preview it.

Discover the TURCHI solutions for your site

  • TURCHI 300F pile driver at work in a photovoltaic field
    150 piles per day
    Machine type
    Self-propelled tracked
    Working height
    6 m
    Weight
    4,400 kg
    Impact energy
    950 / 1,200 / 1,500 J
    System pressure
    180 bar
    Front tilt
    +10° / -51°
    Side tilt
    ±10°
    Ideal for

    Solar plants of 3+ MW and large projects

  • TURCHI 260F pile driver on a road construction site
    150 piles per day
    Machine type
    Self-propelled tracked
    Working height
    3.5 m
    Weight
    3,500 kg
    Impact energy
    950 / 1,200 / 1,500 J
    System pressure
    170 bar
    Front tilt
    +10° / -51°
    Side tilt
    ±10°
    Ideal for

    Solar plants of 1-2 MW and road sites

  • TURCHI 160 pile driver installing a guardrail
    100 piles per day
    Machine type
    Truck-mounted (CA / PF)
    Working height
    2.65 m
    Weight
    1,500 / 1,800 kg
    Impact energy
    830 J
    System pressure
    170-180 bar
    Front tilt
    +10° / -15°
    Side tilt
    ±9.5° / ±10°
    Ideal for

    Guardrails and mobile sites