Guides

Pile driver working height: how to choose it

1 min read

Working height determines the maximum pile length a pile driver can handle. If it is insufficient, the project requires costlier or less efficient solutions.

The choice depends on pile length, embedment depth, and ground conditions. Solar sites and road projects have different requirements.

Working heights of TURCHI models

ModelWorking heightTypical use
TURCHI 260FUp to 3.5 mGuardrails, standard-length piles
TURCHI 300FFrom 4,40 to 6 m (with extensions)Utility-scale solar, long piles

The TURCHI 260F suits guardrails and standard-length piles. The TURCHI 300F is designed for utility-scale solar sites with longer piles and adjustable height through extensions.

Site requirements

The assessment starts with three data points:

  • Pile length to be driven.
  • Embedment depth required by the project.
  • Ground conditions, which affect the usable depth.

At solar sites, piles typically require heights above 4 m. For this range, the TURCHI 300F reaches from 4,40 to 6 m with extensions.

Other selection criteria

In the road sector, heights from 2,50 to 3,50 m are generally sufficient. The comparison between truck-mounted and self-propelled pile drivers helps assess the right configuration for guardrails.

Working height is the first criterion, but the full choice also requires impact energy, ground conditions, and productivity. The solar pile driver buying guide examines these factors.

Once pile length, embedment depth, and ground conditions are defined, the 7-step configurator helps set up the machine for your site.

In this article

Frequently asked questions

Can't find what you're looking for? Browse the full FAQ list. Reach out via a support request or email us at [email protected].

It is the parameter that defines the maximum pile length the machine can handle. Insufficient height forces costlier or less efficient alternatives, so it is the first selection criterion.

The TURCHI 260F reaches up to 3,50 m and suits guardrails and standard-length piles. The TURCHI 300F works from 4,40 to 6,00 m with extensions, for utility-scale solar projects with longer piles.

Build your pile driver

Configure the perfect machine for your site in 7 steps.

Configure
[email protected]

Discover the TURCHI solutions for your site

  • TURCHI 300F pile driver at work in a photovoltaic field
    150 piles per day
    Machine type
    Self-propelled tracked
    Working height
    6 m
    Weight
    4,400 kg
    Impact energy
    950 / 1,200 / 1,500 J
    System pressure
    180 bar
    Front tilt
    +10° / -51°
    Side tilt
    ±10°
    Ideal for

    Solar plants of 3+ MW and large projects

  • TURCHI 260F pile driver on a road construction site
    150 piles per day
    Machine type
    Self-propelled tracked
    Working height
    3.5 m
    Weight
    3,500 kg
    Impact energy
    950 / 1,200 / 1,500 J
    System pressure
    170 bar
    Front tilt
    +10° / -51°
    Side tilt
    ±10°
    Ideal for

    Solar plants of 1-2 MW and road sites

  • TURCHI 160 pile driver installing a guardrail
    100 piles per day
    Machine type
    Truck-mounted (CA / PF)
    Working height
    2.65 m
    Weight
    1,400-1,800 kg
    Impact energy
    720 / 830 / 950 J
    System pressure
    170-180 bar
    Front tilt
    +10° / -51°
    Side tilt
    ±9.5° / ±10°
    Ideal for

    Guardrails and mobile sites